Checking before
it reaches the counter
Project and regulation in the same frame. Spot deviations and save precious time.
Non-compliance is discovered too late
The conceptual design takes weeks to prepare, only to be returned at the counter because of a single parameter.
The fix costs more than the check.
How close it is to the limit
Example: residential-commercial building, Podgorica, DUP Zabjelo.
Within limits
Within limits
Shortfall of 0.15 m
Shortfall of 8 spaces
Four steps
Loading
Preliminary design and cadastral data of the parcel.
Reading conditions
The applicable plan for that zone and the regulations that relate to it.
Comparison
Each parameter against its limit, with the difference.
Finding
A list of compliant, at-risk and non-compliant items with their source.
We track new spatial plans and regulations of the Ministry of Spatial Planning, Urbanism and State Property every day
Request access
Beta means the platform works, but it is still learning. Users in the beta phase influence
which regulations are processed next.